Design and installation of a hybrid water transmission system:

Show simple item record

dc.contributor.author Ahebwa, Clington
dc.contributor.author Akello, Nerie Peace
dc.contributor.author Anebo, Esther
dc.contributor.author Kamuhanda, Benon
dc.date.accessioned 2024-10-01T07:54:13Z
dc.date.available 2024-10-01T07:54:13Z
dc.date.issued 2024
dc.identifier.citation Ahebwa, C. . . . et al. (2024). Design and installation of a hybrid water transmission system: case study: Busitema university, BH1. Busitema University. Unipublished dissertation. en_US
dc.identifier.uri http://hdl.handle.net/20.500.12283/4280
dc.description Dissertation en_US
dc.description.abstract The Busitema water supply system was installed in 1971, comprised of three electrically- powered boreholes delivering into a common 4” galvanized iron pipe that fed a 120 m 3 pressed steel storage tank. However, borehole BH 4133 delivering 4.63 m 3 /h developed a mechanical failure of the pump due to silting and corrosion of the 3” GI pipes which cut off the supply to the tank. The University failed to meet the high maintenance and operational costs incurred and decided to change the design of the borehole to the hand pump which has posed a big challenge in supply to sanitary facilities within the university premises. Currently the university is supplied by National Water and Sewerage Corporation of 7 m 3 /day and one existing borehole as the main water sources to meet the water demand at the campus (students and university staff). However national water is unreliable and costly and one existing borehole has failed to supply enough water to fully meet the demands of the increasing population due to power outages. This has therefore led to poor sanitation and hygiene. en_US
dc.description.sponsorship Eng. Badaza Mohammed ; Mr. Ologe Hector Daniel ; Busitema University en_US
dc.language.iso en en_US
dc.publisher Busitema University en_US
dc.subject Hybrid water transmission system en_US
dc.subject Water supply system en_US
dc.subject Electrically- powered boreholes en_US
dc.title Design and installation of a hybrid water transmission system: en_US
dc.title.alternative case study: Busitema university, BH1 en_US
dc.type Other en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search BUOADIR


Browse

My Account