Industrial field attachment carried out at Mbale Resort Hotel limited from 04th June to 24th July 2023

dc.contributor.authorApio, Ritah
dc.date.accessioned2024-02-19T08:30:07Z
dc.date.available2024-02-19T08:30:07Z
dc.date.issued2024
dc.description.abstractThis is explaining a brief summary of what is coiled in the report. This report explains the details of the events and activities with each project been involved and outlined under every chapter. Chapter one introduces you to the history, mission which is to render exceptional services and products to all our clients, guests and provide a fair return on investment and the vision is to be preferred hospitality destination in the region and values of Mbale resort hotel which the trainee was attached. Other chapters discuss about the description of work carried out, duties assigned, new knowledge and skills gained, work relationship between departments of the organization attached to and challenges experienced or encountered by the trainee and how they were handled and lastly, the conclusion, recommendation and limitations of the industrial training. The challenges encountered during the training were: Language barrier, lack of proper kitchen facilities, lack of a well-equipped laundry unit, the Hotel has only one main kitchen with a small space that leads to congestion among cooks and trainees especially during busy days, they don’t even prepare enough dishes, long distance to the hotel, the trainees are over worked on the expense of the staff, there exists sexual harassment from the male staff to the female trainees and lack of an elevator which made climbing of steps to and from the guests rooms tiresome. In conclusion, the field work study was fair that is it was carried out with maximum cooperation that existed between the trainee, the organization, the head of department and the agency supervisor who guided me where necessary that made the internship successfulen_US
dc.description.sponsorshipEmusugut Desterio, Busitema Universityen_US
dc.identifier.citationRitah A.(2024) Industrial field attachment carried out at Mbale Resort Hotel limited from 04th June to 24th July 2023. Busitema University.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12283/4082
dc.language.isoenen_US
dc.publisherBusitema Universityen_US
dc.subjectInternship trainingen_US
dc.subjectHotel Industryen_US
dc.titleIndustrial field attachment carried out at Mbale Resort Hotel limited from 04th June to 24th July 2023en_US
dc.typeThesisen_US

Files

Original bundle

Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
Apio-Dept.-of-Toursim-&-Hospitality-Mgt-2023.pdf
Size:
1021.23 KB
Format:
Adobe Portable Document Format
Description:
Internship Report
Loading...
Thumbnail Image
Name:
Apio-Abstract.pdf
Size:
1.07 MB
Format:
Adobe Portable Document Format
Description:
Abstract

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: