Industrial training report At Afro link metal works Uganda Limited

dc.contributor.authorMassa, Richard
dc.date.accessioned2021-02-24T08:00:14Z
dc.date.available2021-02-24T08:00:14Z
dc.date.issued2021-02-07
dc.descriptionIndustrial training reporten_US
dc.description.abstractChapter one contains the back ground and location of afro link metal works, its core values, mission, strategic objectives and company policies. It also contains the main objective of industrial training and the specific objectives of the study Chapter two contains the core activities of afro link metal works, the activities are costing of fabrication materials, fabricating products e.g. doors, windows, stare case rails, water tanks double decker’s, case study and cleaning. Chapter three contains arc welding, inspection and testing methods, weld ability, assignment, procedure of welding a car or motorcycle and measurements, lessons and skilled gained are contained in a sub-chapter. Chapter four contains, challenges, recommendations, conclusion, appendices and referencesen_US
dc.description.sponsorshipKapchorwa senior secondary school Busitema universityen_US
dc.identifier.citationMassa, Richard. (2021). Industrial training report At Afro link metal works Uganda Limited. Busitema University.Unpublished Dissertation.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12283/558
dc.language.isoenen_US
dc.publisherBusitema Universityen_US
dc.subjectFabrication materialsen_US
dc.subjectFabricating productsen_US
dc.subjectArc weldingen_US
dc.subjectInspection and testingen_US
dc.subjectWeld abilityen_US
dc.subjectMeasurementsen_US
dc.titleIndustrial training report At Afro link metal works Uganda Limiteden_US
dc.typeTechnical Reporten_US

Massa-Dept.AMIE-2021.pdf
1.61 MB
Adobe Portable Document Format
Industrial training report
Massa-Dept.AMIE-2021-Abstract.pdf
397.76 KB
Adobe Portable Document Format

license.txt
1.71 KB
Item-specific license agreed upon to submission