Feasibility assessment of potential site for hydropower production

dc.contributor.authorMwambu, Cedric Namudoto
dc.date.accessioned2025-11-26T06:56:32Z
dc.date.available2025-11-26T06:56:32Z
dc.date.issued2025
dc.descriptionDissertationen_US
dc.description.abstractThis study investigates the feasibility of a potential site for hydropower production within the River Cheptui watershed, located in the eastern region of Uganda. With Uganda relying heavily on hydropower for electricity generation, and only a small portion of its potential capacity utilized, the research focuses on identifying viable small hydropower sites to enhance rural electrification and sustainable energy development. The study assessed the topographic characteristics of the watershed to estimate the gross head, evaluated the hydrological potential through rainfall-runoff modeling using HEC-HMS, and developed a hydropower energy model using RETScreen to estimate the annual energy output. Topographic analysis revealed a gross head of 115 meters, making the site suitable for run-of-river hydropower generation. Hydrological simulations based on 18 years of CHIRPS rainfall data estimated an average river flow of 5.1 m³/s, with a selected design flow of 3.1 m³/s. Energy modeling indicated an average annual energy production of 14.04 GWh, with variability due to seasonal rainfall patterns. The plant exhibited a capacity factor of 61.6%, with full capacity operation achieved over 45% of the year. The findings confirm the technical and hydrological viability of the site for small-scale hydropower development. The study recommends further environmental assessments, integration of hybrid renewable systems, and stakeholder engagement to ensure sustainable implementation. This research contributes to Uganda’s national energy goals and the achievement of Sustainable Development Goal 7 by promoting access to clean, affordable, and reliable energy. Keywords: Hydropower feasibility, River Cheptui, Run-of-river, Gross head, HEC-HMS, RETScreen, Small-scale hydropower, Rural electrification, Hydrological modeling, and Energy generation.en_US
dc.description.sponsorshipMr. Mugisha Moses; Busitema Universityen_US
dc.identifier.citationMwambu, C.N. (2025). Feasibility assessment of potential site for hydropower production casestudy: river cheptui watershed. Busitema University. Unpublished dissertation.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12283/4526
dc.language.isoenen_US
dc.publisherBusitema Universityen_US
dc.subjectSmall-scale hydropoweren_US
dc.subjectHydropower productionen_US
dc.subjectHydrological modellingen_US
dc.titleFeasibility assessment of potential site for hydropower productionen_US
dc.title.alternativecasestudy: river cheptui watersheden_US
dc.typeOtheren_US

Mwambu_Abstract.pdf
400.61 KB
Adobe Portable Document Format
Abstract
Mwambu_Dept._of_WAR_2025.pdf
5.72 MB
Adobe Portable Document Format
Dissertation