Analysis of shovel-truck system for optimal selection at Tororo cement quarry.

dc.contributor.authorLokwe, Emmanuel
dc.date.accessioned2022-06-29T13:14:38Z
dc.date.available2022-06-29T13:14:38Z
dc.date.issued2016-05
dc.descriptionDissertationen_US
dc.description.abstractThis project report entails the analysis of shovel-truck system for optimal selection at Tororo Cement Limited Quarry, in Tororo-Uganda, with the basic aim of optimizing cycle time, material size, loading distance through and cost of shovel-truck system. This is justified by the fact that, Material handling account for 60% of the total operating cost of the mines, so it is desirable to maintain an efficient material handling system. This is due to the facts that as the size of fleet being used increases, shovel productivity increases but truck productivity decreases, so an effective fleet size must be chosen that utilize all equipment. (May et al. 2012) This was done by thoroughly reviewing literatures of shovel-truck productivity, cost of handling material, effects of field parameters and application of models that optimize the time parameter and general impact on a company's productivity at the quarry. Shovel-truck system operational data from the quarry was analyzed and applied to a multi-channel queuing model representative of the loading process of the haul cycle. The outputs of the model was compared with actual data to evaluate the validity of the queuing model used-(May et al. 2012) The end aim of project is to optimize the time to ensure that the practices is conducted in the fastest means possible with maximum utilization of the availed equipment for output and profit maximization.en_US
dc.description.sponsorshipMr. Nasasira Hillary, Busitema University.en_US
dc.identifier.citationLokwe, Emmanuel. (2016). Analysis of shovel-truck system for optimal selection at Tororo cement quarry. Busitema University. Unpublished dissertation.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12283/1831
dc.language.isoenen_US
dc.publisherBusitema University.en_US
dc.subjectShovel-truck systemen_US
dc.subjectHandling systemen_US
dc.subjectShovel-truck productivityen_US
dc.subjectQuarryen_US
dc.subjectOptimal selectionen_US
dc.titleAnalysis of shovel-truck system for optimal selection at Tororo cement quarry.en_US
dc.typeThesisen_US

Files

Original bundle

Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
Lokwe - Dept. of Mining, 2016.pdf
Size:
12.38 MB
Format:
Adobe Portable Document Format
Description:
Dissertation
Loading...
Thumbnail Image
Name:
Lokwe - Abstract.pdf
Size:
1.81 MB
Format:
Adobe Portable Document Format
Description:
Abstract

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: