Optimisation of gold recovery by adjusting the CIC extraction process :

dc.contributor.authorAsiimwe, Jonard
dc.date.accessioned2022-06-23T07:56:47Z
dc.date.available2022-06-23T07:56:47Z
dc.date.issued2016-06
dc.descriptionDissertationen_US
dc.description.abstractSeveral methods exist to recover gold from ores such as leaching, gravity concentration and flotation. Leaching by cyanide solutions or gold cyanidasation, however, has been the main metallurgical process for gold extraction for more than one century, however the in CIC method has greatly been picked interest by almost everyone who may wish to recover more gold than other methods like wet panning gold washing using ice boxes etc. However, it has failed to meet the expected recovery due to the great chemistry involved in it that affects the dissolution of gold and its respective adsorption. In reference to Mubende TMT CIC plant, the low dissolution of gold is affected by the competing copper ions which can also react with cyanide solution in almost same conditions as gold also could react to form complexes that also affects directly the final gold that could be adsorbed by the activated carbon prompting to low recovery, however, this problem has been looked for measures to curb it, through increasing the cyanide concentration, varying pH, regular testing for the concentration of gold in the tailing before filled in the tanks and pre-treating the tailing mix. Among the above measures from observations pre-treatment of tailing mixture before cyanide leaching is carried out is the most cost effective and has an advantage of recovery of copper which can also be sold to increase on the sales of the company, reduces the consumption of cyanide solution and does not almost change the usual operating system apart from pre-treatment section. The excel programme has been used to analyse the results and solid edge used to redesign the recommended layout of the improved CIC planten_US
dc.description.sponsorshipMr. Mukiibi Ivan, Busitema University.en_US
dc.identifier.citationAsiimwe, Jonard. (2016). Optimisation of gold recovery by adjusting the CIC extraction process : case study : TMT-Mubende plant. Busitema university. Unpublished dissertation.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12283/1790
dc.language.isoenen_US
dc.publisherBusitema University.en_US
dc.subjectGolden_US
dc.subjectOresen_US
dc.subjectLeachingen_US
dc.subjectGravity concentrationen_US
dc.subjectFlotationen_US
dc.subjectCyanide solutionsen_US
dc.subjectGold cyanidasationen_US
dc.subjectCIC methodsen_US
dc.subjectGold recoveryen_US
dc.subjectExtraction processen_US
dc.titleOptimisation of gold recovery by adjusting the CIC extraction process :en_US
dc.title.alternativecase study : TMT-Mubende plant.en_US
dc.typeThesisen_US

Asiimwe - Dept. of Mining, 2016.pdf
3.43 MB
Adobe Portable Document Format
Dissertation
Asiimwe - Abstract.pdf
449.56 KB
Adobe Portable Document Format
Abstract

license.txt
1.71 KB
Item-specific license agreed upon to submission