Investigating the causes of rock overreach during blasting operations

Show simple item record

dc.contributor.author Auma, Irene, Wasena
dc.date.accessioned 2021-02-15T14:24:04Z
dc.date.available 2021-02-15T14:24:04Z
dc.date.issued 2020-02-15
dc.identifier.citation Auma, Irene, W. (2020).Investigating the causes of rock overreach during blasting operations: Case study at Roko construction stone quarry limited. Busitema University. Unpublished dissertation. en_US
dc.identifier.uri http://hdl.handle.net/20.500.12283/408
dc.description Dissertation en_US
dc.description.abstract Backbreak or overbreak: This is when the rock mass behind the row of blastholes farthest from the face is broken or cracked. Roko construction stone Quarry is located in Nakagere Village, bukerere sub county, mukono district (Uganda) ROKO construction quarry limited is a surface mine applying bench drilling and blasting and its operations being affected by one of the most issues associated with the blasting, backbreak/overbreak. The quarry consists of five stable benches those of 10m, 15m,7m, 9m and 8m. These benches have high Q value ranging from (49.675-49.125) the Q system rock mass rating for the upper benches and for the lower benches are slightly weathered and high UCS ranging from (112- 200Mpa) and (50-80Mpa) range for upper benches The holes have a diameter of 50mm, subdrill of 0.8m and blasthole depth varying with the bench height, the holes are drilled vertically at a spacing of 2.1m, 1.6m burden Generally, the quarry has a strong rock favouring stability despite for the first row of each bench Although the design powder factor is 0.37 according to the research it increases to 0.46 which is within the range of hard rock blast but corresponding to small spacing and burden These research addresses the cause of backbreak/overbreak after the investigation on the geological properties, drilling and blasting parameters, assessing of the rock strength and statistically analyzing the data using multiple linear regression method in SPSS en_US
dc.description.sponsorship Mr. Nuwabareba Edson Mr. wanji Mario Busitema University en_US
dc.language.iso en en_US
dc.publisher Busitema University en_US
dc.subject Investigating en_US
dc.subject Rock en_US
dc.subject Overbreak en_US
dc.subject Blasting operations en_US
dc.subject Bench drilling en_US
dc.subject Quarry en_US
dc.title Investigating the causes of rock overreach during blasting operations en_US
dc.title.alternative Case study at Roko construction stone quarry limited en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search BUOADIR


Browse

My Account