Optimization of materials handling fleet performance

Show simple item record

dc.contributor.author Wankwaki, Sharon
dc.date.accessioned 2021-02-24T05:26:02Z
dc.date.available 2021-02-24T05:26:02Z
dc.date.issued 2021-02-07
dc.identifier.citation Wankwaki, Sharon. (2021). Optimization of materials handling fleet performance, Case study: Hima cement quarry. Busitema University. Unpublished Dissertation. en_US
dc.identifier.uri http://hdl.handle.net/20.500.12283/551
dc.description Dissertation en_US
dc.description.abstract In the surface mining industry, fleets of trucks and loaders are the most commonly used for materials handling. In order to maximize truck per shovel match factor, fleet management has to be well organized. the equipment selection problem therefore involves choosing a fleet of trucks and loaders that have the capacity to move the materials specified in the mine plan. The optimisation problem is to select these fleets such that the overall cost of materials handling is minimised. The scale of operations is such that although a single machine may cost several million dollars to purchase, the cost of operation outweighs this expense over several years. The equipment selection problem is cursed with a cascade of inter-dependent variables and parameters. For example, the cost of operating a piece of equipment depends on its utilisation; the utilisation depends on the availability of the equipment; and the availability depends on the age of the equipment At Hima cement quarry, the expected productivity is never being met and one of the main problems is mismatching fleet. As a result, more is spent on power (more kiloWatts for each ton of limestone), maintenance costs, risk of stopping the clinkering plant (billions lost for each stoppage), higher charges from the contractor – fuel, spares. This research project was therefore aimed at optimizing fleet in terms of performance. This objective was archived by assessing current fleet performance of Hima cement quarry, developing a mathematical model and the results of the model were tested in MATLAB using experimental methods. Several tests had to be run before making conclusions and recommendations en_US
dc.description.sponsorship Mr. Bakama Micheal Busitema University en_US
dc.language.iso en en_US
dc.publisher Busitema University en_US
dc.subject Materials handling en_US
dc.subject Fleet performance en_US
dc.subject Cement quarry en_US
dc.subject Mining industry en_US
dc.title Optimization of materials handling fleet performance en_US
dc.title.alternative Case study: Hima cement quarry en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search BUOADIR


Browse

My Account